{"id":25849,"date":"2016-03-10T13:07:57","date_gmt":"2016-03-10T07:37:57","guid":{"rendered":"http:\/\/news.entecity.com\/?p=25849"},"modified":"2016-03-10T13:07:57","modified_gmt":"2016-03-10T07:37:57","slug":"phase-ii-of-the-nh-bypass-from-mukkola-to-karode-to-begin-soon","status":"publish","type":"post","link":"https:\/\/entecity.com\/news\/phase-ii-of-the-nh-bypass-from-mukkola-to-karode-to-begin-soon\/","title":{"rendered":"Phase II of the NH Bypass from Mukkola to Karode to Begin Soon!"},"content":{"rendered":"<p>It is reported that the second phase of the By-pass widening from Mukkola to Karode in the Kerala-Tamil Nadu border will begin in three months\u2019 time.<\/p>\n<p>The officials have started cutting trees on the proposed stretch. According to officials, maximum number of trees will be protected or replanted. NHAI have said that around 90% of the land acquisition on the stretch has been completed. The remaining acquisition in five villages will be carried out after compensation is handed out.<\/p>\n<div id=\"attachment_25852\" style=\"width: 752px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-25852\" class=\"wp-image-25852 size-large\" src=\"http:\/\/news.entecity.com\/files\/2016\/03\/Nh-bypass-Trivandrum-2-768x432.jpg\" alt=\"From Kovalam Junction, Photo Credit: Ziyan,SSC\" width=\"742\" height=\"417\" srcset=\"https:\/\/entecity.com\/news\/files\/2016\/03\/Nh-bypass-Trivandrum-2-768x432.jpg 768w, https:\/\/entecity.com\/news\/files\/2016\/03\/Nh-bypass-Trivandrum-2.jpg 1024w\" sizes=\"(max-width: 742px) 100vw, 742px\" \/><p id=\"caption-attachment-25852\" class=\"wp-caption-text\">From Kovalam Junction, Photo Credit: Ziyan,SSC<\/p><\/div>\n<p>The preliminary works will begin after the work is awarded to the lowest financial bidder.\u00a0 It is expected to be finalised soon since the financial bid for the construction works are expected to open within ten days.<\/p>\n<div id=\"attachment_25851\" style=\"width: 752px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-25851\" class=\"wp-image-25851 size-large\" src=\"http:\/\/news.entecity.com\/files\/2016\/03\/Nh-bypass-Trivandrum-1-768x483.jpg\" alt=\"Photo Credit: Ziyan,SSC\" width=\"742\" height=\"466\" srcset=\"https:\/\/entecity.com\/news\/files\/2016\/03\/Nh-bypass-Trivandrum-1-768x483.jpg 768w, https:\/\/entecity.com\/news\/files\/2016\/03\/Nh-bypass-Trivandrum-1.jpg 1024w\" sizes=\"(max-width: 742px) 100vw, 742px\" \/><p id=\"caption-attachment-25851\" class=\"wp-caption-text\">Photo Credit: Ziyan,SSC<\/p><\/div>\n<p>&nbsp;<\/p>\n<p>Six major companies including KNR constructions, the present contractor of the first phase of the highway work, have submitted technical bids for the construction of the second phase. Other companies include L&amp;T Hindustan Construction Company, Telma- Sreedhanya joint venture, Sadbhav Engineering limited and BSCPL Infrastructure.<\/p>\n<div id=\"attachment_25853\" style=\"width: 1034px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-25853\" class=\"wp-image-25853 size-full\" src=\"http:\/\/news.entecity.com\/files\/2016\/03\/Nh-bypass-Trivandrum-3.jpg\" alt=\"Photo Credit: Ziyan,SSC\" width=\"1024\" height=\"713\" srcset=\"https:\/\/entecity.com\/news\/files\/2016\/03\/Nh-bypass-Trivandrum-3.jpg 1005w, https:\/\/entecity.com\/news\/files\/2016\/03\/Nh-bypass-Trivandrum-3-736x513.jpg 736w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><p id=\"caption-attachment-25853\" class=\"wp-caption-text\">Photo Credit: Ziyan,SSC<\/p><\/div>\n<p>The 16.5 kilometre stretch will be developed into a six lane stretch with a total cost of Rs 805 crore. The major points on the stretch where the road will pass through are Mukkola, Payattuvila, Marappalam, Kazhivoor, Thadathikulam, Mulluvila, Pazhayakada, Thirupuram, Vlathankara, Poozhikunnu and will be connected to Inchivila near Kaliyikkavila.<\/p>\n<p>The notification for the widening of the Mukkola-Karode stretch was issued nearly three decades ago.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>It is reported that the second phase of the By-pass widening from Mukkola to Karode in the Kerala-Tamil Nadu border will begin in three months\u2019 time. The officials have started cutting trees on the proposed stretch. According to officials, maximum number of trees will be protected or replanted. NHAI have said that around 90% of [&hellip;]<\/p>\n","protected":false},"author":44,"featured_media":25850,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[32,4],"tags":[452],"class_list":["post-25849","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-city-news","category-general","tag-trivandrum"],"_links":{"self":[{"href":"https:\/\/entecity.com\/news\/wp-json\/wp\/v2\/posts\/25849"}],"collection":[{"href":"https:\/\/entecity.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/entecity.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/entecity.com\/news\/wp-json\/wp\/v2\/users\/44"}],"replies":[{"embeddable":true,"href":"https:\/\/entecity.com\/news\/wp-json\/wp\/v2\/comments?post=25849"}],"version-history":[{"count":0,"href":"https:\/\/entecity.com\/news\/wp-json\/wp\/v2\/posts\/25849\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/entecity.com\/news\/wp-json\/wp\/v2\/media\/25850"}],"wp:attachment":[{"href":"https:\/\/entecity.com\/news\/wp-json\/wp\/v2\/media?parent=25849"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/entecity.com\/news\/wp-json\/wp\/v2\/categories?post=25849"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/entecity.com\/news\/wp-json\/wp\/v2\/tags?post=25849"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}