{"id":27222,"date":"2016-11-08T17:10:45","date_gmt":"2016-11-08T11:40:45","guid":{"rendered":"http:\/\/entecity.com\/news\/?p=27222"},"modified":"2016-11-08T19:13:22","modified_gmt":"2016-11-08T13:43:22","slug":"5-infrastructure-project-for-trivandrum","status":"publish","type":"post","link":"https:\/\/entecity.com\/news\/5-infrastructure-project-for-trivandrum\/","title":{"rendered":"5 Infrastructure Project For Trivandrum worth Rs.525.99 Crore Cleared! Includes 3 flyovers"},"content":{"rendered":"<p>Kerala Infrastructure Investment Board (KIIFB) has given approval for five infrastructure project in the city.<\/p>\n<p>The five projects are the construction of flyovers at Sreekaryam, Pattom and Ulloor junctions, the four-laning of the 6.5-km Pravachambalam-Vazhimukku corridor of the National Highway 66-and the first building at Technocity.<\/p>\n<p>In the meeting conducted by the newly formed KIIFB, these 5 projects estimated to cost Rs.525.99 crore were cleared. Four of the project comes under the PWD while the one will be under the IT Department. All had received administrative sanction from the government already.<\/p>\n<blockquote><p>Four of the project comes under the PWD while the one will be under the IT Department. All had received administrative sanction from the government already.<\/p><\/blockquote>\n<p>The total outlay of the Reach II of the 29.2-km Karamana-Kaliyikkavila stretch of the NH 66 is Rs.153 crore. The KIIFB has allocated Rs.50 crore as the first instalment for the works. The four-laned stretch will be 30.2-m wide with a 3.5-m median to accommodate the Metro up to Neyyattinkara.<\/p>\n<h3>Flyovers<\/h3>\n<p>The three flyovers were proposed by DMRC as part of the 21.82-km Technocity-Karamana elevated metro corridor.<\/p>\n<p>Flyover at Sreekaryam costs Rs.135.37-crore and will have a length of 630m with common pillars for vehicular traffic and MRTS. A sum of Rs.50 crore has been given as the first instalment for the flyover. Meanwhile, at Ulloor, a flyover is proposed to the Medical College side which has a length of 390m at a cost of Rs.52.68 crore The KIIFB has given Rs.18 crore for the Ulloor flyover. The flyover at Pattom from near the PSC office will have a length of 570 m and will end near Plamood. Of the Rs.84.60 crore needed, the KIIFB has given Rs.32 crore. As much as 2.27 hectares has to be acquired, 163 buildings shifted for the three flyovers that will incur Rs. 272.68 crore.<\/p>\n<p>For the first building at Technocity, with 2 lakh sq ft, has an outlay of Rs.100 crore, but only Rs. 2 crore had been given as the first instalment by the KIIFB.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kerala Infrastructure Investment Board (KIIFB) has given approval for five infrastructure project in the city. The five projects are the construction of flyovers at Sreekaryam, Pattom and Ulloor junctions, the four-laning of the 6.5-km Pravachambalam-Vazhimukku corridor of the National Highway 66-and the first building at Technocity. In the meeting conducted by the newly formed KIIFB, [&hellip;]<\/p>\n","protected":false},"author":44,"featured_media":23008,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[32,4],"tags":[452],"class_list":["post-27222","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-city-news","category-general","tag-trivandrum"],"_links":{"self":[{"href":"https:\/\/entecity.com\/news\/wp-json\/wp\/v2\/posts\/27222"}],"collection":[{"href":"https:\/\/entecity.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/entecity.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/entecity.com\/news\/wp-json\/wp\/v2\/users\/44"}],"replies":[{"embeddable":true,"href":"https:\/\/entecity.com\/news\/wp-json\/wp\/v2\/comments?post=27222"}],"version-history":[{"count":7,"href":"https:\/\/entecity.com\/news\/wp-json\/wp\/v2\/posts\/27222\/revisions"}],"predecessor-version":[{"id":27229,"href":"https:\/\/entecity.com\/news\/wp-json\/wp\/v2\/posts\/27222\/revisions\/27229"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/entecity.com\/news\/wp-json\/wp\/v2\/media\/23008"}],"wp:attachment":[{"href":"https:\/\/entecity.com\/news\/wp-json\/wp\/v2\/media?parent=27222"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/entecity.com\/news\/wp-json\/wp\/v2\/categories?post=27222"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/entecity.com\/news\/wp-json\/wp\/v2\/tags?post=27222"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}